Posted: May 8, 2018
Each group will plan/design, build, Test, and Demonstrate a working water table that shows erosion of sand via water.
Project parameters:
- Structure is built to contain sand
- Stucture has a defined area
- Structure is waterproof
- Water table contains fixed objects to create a bend in the stream
- Structure is at a fixed angle
- Structure has a fixed set up
- Strucutre has a catch for the run off water
- Structure has a defined start for water
- Groups may create a pump in lieu of last two
Groups:
- Edwin, Issam, Rylin, Will
- Brody H, Jordan, Hailie MC, Koby
- Kohen, Tricia, Jaden, Ethan
- Michael, Nash, Halie M, Mitchell
- Phelan, Emmy, Jorjia, Brody M